Our term successfully executed 10 dynamic propulsion positioning Fify1 PSV’s at Cochin Shipyard Ltd.
Completed 8 PSV’s including their underwater works in Tebma Shipyard Pvt. Ltd
One bulk carrier vessel and one offshore supply vessel with ABS in Timblo dry docks Pvt.Ltd Goa.
Successfully completed 20 fast patrolling Vessel (High Speed) for Indian Cost Guard at Cochin Shipyard Ltd.
Technical and manufacturing support with SKA marine Pvt .Ltd Chennai.
Successfully completed engine room and Diesel Alternator room piping with Structural items in INS Vikrant (Air craft carrier Vessel of Indian Navy).
Aviation fuel systems and higher diameter exhaust system with silencer (16 Nos) erection in INS Vikrant (Air craft carrier Vessel of Indian Navy) and Similar Repair works of Naval vessels in Repair yards.
Completed all types of structural and piping works of Pump Room and DG room of Deck Cargo/Jacket Launch Barge (30000 MT) Built for NPCC Abu Dhabi.
Engine room and Accommodation piping and Structural works in 4 Nos of passenger vessels for Andaman Nicobar Island.
Piping and Structural works in Aluminium Catamaran water metro vessel for Kochi Water Metro.
A Major part of Hull fabrication ,Grand assembly and erection works of 4 Nos JSW mini Bulk carrier vessels.
Fabrication Alignment and erection works of cargo hold Hatch coaming for 4 Nos mini Bulk carrier vessel with automated tools.
Complete Engine room and structural works of Mini bulk carrier vessels in cutting its testing, commissioning assistance and trial assistance.
Total piping fabrication , erection and commission works of 2 Nos of FBOP vessels for Boarder Security force (BSF)
Naval vessels Hull fabrications, including aluminum in Cochin Shipyard Ongoing Naval Projects.
Key selected member in fabrication and erection of fully autonomous vessels for ASKO projects.
Renewal of 25mm thikness 15000 PSI mud pumping lines of Sagar Bhushan ONGC